c12304bar12304barcCOMBINATION BOILERHeating and Instantaneous Domestic Hot WaterFanned Flue systemInstallation and Operatinginstructions
107 Installing the boiler (continued)ADJUSTMENTChoice of mode :- Function without room thermostat bridge “S” remains inplace.- Function with room ther
118 Commissionning and testingPre-commissioningEnsure that the system has been adequately flushed.Purge gas supply of air and test for soundness.Carry
129 System guidanceThe boiler is suitable for sealed systems only. Themaximum cold water mains pressure for the appliance is10 bar. All fittings and p
1310User’s instructions192325222624Fig. 222829Control panel19. Two position Selector switchO = Switched OFFI = Switched ON20. = Domestic hot water te
14Fig. 2411Instruction for setting the built in clock (if fittied)1. General layoutThe mechanical clock covers a 24 hour period. Each tappetrepresents
15CODE FAULT30 40 50 60 70 80❍❍❍❍❍ Overheat sensor switch open.❍❍❍❍❍ Overheating defect without lock out.❍❍❍❍ No flame detection.❍❍❍❍❍ Ionisation
Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications withoutprior notice and acc
2These instructions are suitable for the following boilers :Britony Combi SE. 80Britony Combi SE.100Do not forget the Logbook!Chaffoteaux & Maury
3ContentsPageCUSTOMER CARE... 2Guarantee... 2Statut
4Fig.1123453497835141115161718Fig.22DescriptionLocation of components1. - Air pressure switch2. - Steel chassis complete with expansion vessel3. - Mai
53 Technical dataBritony combi SE.80 SE.100Appliance categoryCat II 2H 3+Cat II 2H 3+Heat Gross input C/H & DHW Maximum in kW 28.7 34.6Maximum i
64 Dimensions (continued)54 54 54 54JKLMNI88JKLMN23223532Fig. 42123606772185038050Ø 100Type C 12206143Ø 125TypeC32xx250Ø 80Type C 12, C 42 or C 22Ty
7Domestic Hot Water ModeIn order to supply hot water, the main switch 19 Fig. 6must be in ON position I This will be confirmed by thegreen indicator l
LocationThe boiler can be installed on any suitable internal wall. Provisionmust be made to allow the correct routing of the flue and siting of theter
9Fig. 912304barAAAAPlace the boiler on the wall on the hanging bracket.If required, there is space for all piping to pass behind theboiler. Using fig.